1. Produktua amaitu daview
The GEYA GRT6-B2 is an electronic delay off time relay designed for industrial and domestic applications. It features adjustable delay settings and is suitable for DIN rail mounting. This manual provides essential information for safe installation, operation, and maintenance.
Ezaugarri nagusiak:
- Atzerapen erregulagarria: Delay can be set directly via panel knobs for convenience and intuitive control.
- Funtzio moduak: Supports two primary functions: Delay ON (A) and Delay OFF (B). The GRT6-B2 model features 2SPDT (2NO2NC) contacts.
- Denbora tarte zabala: Time scale from 0.1 seconds to 10 days, divided into 10 selectable ranges.
- Egoeraren adierazlea: Equipped with LED indicators for power (green light) and working status (red light).
- Diseinu trinkoa: Ultra-small size, only 18mm width, designed for 35mm DIN rail mounting.

2. Segurtasun informazioa
Please read this manual carefully before installation and operation. Failure to follow these instructions may result in equipment damage, injury, or death. This device should only be installed and serviced by qualified personnel.
- Always disconnect power before installing, wiring, or performing maintenance on the device.
- Ziurtatu kableatu guztiak tokiko eta estatuko arau elektrikoen araberakoak direla.
- Ez erabili gailua hondatuta edo gaizki funtzionatzen badu.
- Babestu gailua hezetasunetik, hautsetik eta muturreko tenperaturetatik.
- Egiaztatu liburu zuzenatage and current ratings before connecting to a power source.
3. Produktuaren neurriak eta osagaiak
The GRT6-B2 relay is designed for compact installation on a DIN rail. Understanding its dimensions and component layout is crucial for proper integration into your system.


4. Instalazioa eta kableatzea
The GEYA GRT6-B2 relay is designed for easy installation on a 35mm DIN rail. Follow these steps for secure mounting and correct electrical connections.
4.1 DIN errailen muntaketa
The relay snaps onto a standard 35mm DIN rail. Ensure it is securely fastened to prevent movement during operation.
4.2 Kableatu elektrikoa
Refer to the wiring diagrams below for proper connection of the power supply and load. Always ensure power is disconnected before wiring.

4.3 Power Connection Demonstration
Watch this video for a visual guide on connecting power and load to the GRT6-B1 model, which shares similar wiring principles with the GRT6-B2.
5. Funtzionamendu-argibideak
The GRT6-B2 relay offers adjustable delay functions. Follow these steps to configure and operate your device.
5.1 Funtzio moduak
The GRT6-B2 supports two main function modes:
- A: Delay ON: The output contacts close after a set delay time once power is applied.
- B: Delay OFF: The output contacts open after a set delay time once the trigger signal is removed or power is disconnected.

5.2 Ordua ezartzea
The delay time is set using two rotary knobs on the front panel: one for time range and one for percentage.

5.3 LED adierazleak
- LED berdea: Energia-horniduraren egoera adierazten du.
- LED gorria: Indicates the working status of the relay (e.g., timing in progress, output active).
6. Mantentzea
The GEYA GRT6-B2 time relay is designed for reliable operation with minimal maintenance. However, periodic checks can help ensure its longevity and proper function.
- Garbiketa: Mantendu gailua garbi eta hautsik eta hondakinik gabe. Erabili zapi lehor eta leun bat garbitzeko. Ez erabili garbitzaile likidorik.
- Ikuskapena: Periodically inspect wiring connections to ensure they are secure and free from corrosion. Check for any signs of physical damage or overheating.
- Ingurumena: Ziurtatu funtzionamendu-ingurunea tenperatura eta hezetasun-tarte jakin batzuen barruan mantentzen dela, matxura goiztiarrak saihesteko.
7. Arazoak
If the GEYA GRT6-B2 relay is not functioning as expected, consider the following common issues:
- No Power Indication (Green LED Off): Check the power supply connections (A1, A2) and ensure the voltage is within the specified range (AC/DC 24V-240V).
- Relay Not Activating/Deactivating:
- Verify the function mode (A or B) is correctly selected.
- Check the time range and percentage ezarpenak.
- Ensure the trigger signal (S) is correctly applied for Delay OFF functions.
- Inspect load connections and ensure the load is functioning correctly.
- Denbora okerra: Re-check the time range and percentage settings. Ensure the knobs are firmly set to the desired values.
- Gehiegizko berotzea: If the device feels excessively hot, check the load current to ensure it does not exceed the relay's maximum rating (10A/AC1).
If problems persist after checking these points, contact a qualified electrician or the manufacturer for assistance.
8. Zehaztapenak
Detailed technical specifications for the GEYA GRT6-B2 time relay.

| Parametroa | Balioa |
|---|---|
| Marka | GEYA |
| Eredua | GRT6-B2 |
| Funtzioa | Delay ON (A), Delay OFF (B) |
| Hornidura Terminalak | A1-A2 |
| liburukiatage Barrutia | AC/DC 24V-240V (50-60Hz) |
| Potentzia Sarrera | AC max. 6VA/1.9W |
| Denbora tarteak | 0.1s - 10 days (ON, OFF) |
| Denbora Ezarpena | Potentiometer |
| Irteera | 2xSPDT (2NO2NC) |
| Egungo balorazioa | 10A/AC1 |
| Aldaketa Voltage | 250 VAC/24 VDC |
| Funtzionamendu-tenperatura | -20°C eta +55°C (-4°F eta 131°F) |
| Biltegiratze Tenperatura | -35°C eta +75°C (-22°F eta 158°F) |
| Muntaketa | DIN rail EN/IEC 60715 |
| Neurriak (L x W x H) | 64 mm x 18 mm x 95 mm (gutxi gorabehera) |
| Pisua | Gutxi gorabehera. 2.08 ontza |
9. Bermea eta Laguntza
For warranty information, please refer to the documentation provided with your purchase or contact your seller. If you require technical support or have questions regarding the GEYA GRT6-B2 time relay, please reach out to the manufacturer or authorized distributor.





